User contributions
From CompetenceBase
- 14:05, 3 July 2024 diff hist -427 Install image equipment (Q318) Removed claim: ESCO description (P12): Set up, install and connect projection and image equipment., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +93 Identify Customers' needs (Q557) Added [it] label: individuare i desideri del cliente
- 14:05, 3 July 2024 diff hist -443 Maintain rigging equipment (Q317) Removed claim: ESCO description (P12): Check rigging equipment before fitting up. Make small repairs if necessary., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -427 Maintain chain hoists (Q316) Removed claim: ESCO description (P12): Check, operate and repair chain hoists on various locations, #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -510 Assemble truss constructions (Q315) Removed claim: ESCO description (P12): Use trusses, metal structures that derive strength from their construction involving triangular shapes, to construct stages for performances., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +91 Plan teamwork (Q556) Added [it] label: pianificare il lavoro di squadra
- 14:05, 3 July 2024 diff hist -426 Hang chain hoists (Q314) Removed claim: ESCO description (P12): Install and set up chain hoists in building constructions., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -457 Install temporary audience accommodation (Q313) Removed claim: ESCO description (P12): Place audience accommodation, fixing it into place with a scaffolding system if required., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +76 Lead a team (Q555) Added [it] label: guidare un gruppo
- 14:05, 3 July 2024 diff hist -471 Assemble performance equipment (Q312) Removed claim: ESCO description (P12): Set up sound, light and video equipment on stage before performance event according to specifications., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -447 Perform regular checks on rigging equipment (Q311) Removed claim: ESCO description (P12): Check rigging equipment before fitting up, and make small repairs if necessary., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +92 Develop professional network (Q553) Added [it] label: sviluppare una rete professionale
- 14:05, 3 July 2024 diff hist -465 Maintain moving constructions on stage (Q310) Removed claim: ESCO description (P12): Check, maintain and repair electrical and mechanical elements of stage elevators and stage traps., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -473 Maintain stage equipment for horizontal movement (Q309) Removed claim: ESCO description (P12): Execute maintenance activities on electro‐mechanical equipment for horizontal movement on stage level., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +98 Document your own practice (Q550) Added [it] label: documentare la propria prassi di lavoro
- 14:05, 3 July 2024 diff hist -520 Operate automated stage movement control system (Q308) Removed claim: ESCO description (P12): Handle an automated controlling system for stage movement and flying systems. Prepare and program the system including multiple synchronised movements., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -556 Follow time cues (Q306) Removed claim: ESCO description (P12): Take cues from actions on the stage and interact with them. Take decisions on the exact timing and procedures in a live environment in order to produce a fluid and consistent performance., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +102 TBU 2 (Q549) Added [it] label: gestire lo sviluppo professionale personale
- 14:05, 3 July 2024 diff hist +80 Promote yourself (Q548) Added [it] label: promuovere sé stessi
- 14:05, 3 July 2024 diff hist -467 Operate stage movement control system (Q305) Removed claim: ESCO description (P12): Command control systems for stage movement, e.g. flying mechanisms. Use manual or electric systems., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -448 Handle scenic elements during rehearsal (Q304) Removed claim: ESCO description (P12): Operate and assemble equipment and scenery material during rehearsal or onstage., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -488 Manage consumables stock (Q382) Removed claim: ESCO description (P12): Supervise and monitor consumables stock to ensure that the production demands and deadlines can be met at all times.""", #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +110 Follow environmentally-sustainable work practices (Q547) Added [it] label: seguire prassi di lavoro ecologicamente sostenibili
- 14:05, 3 July 2024 diff hist -489 Mark the information from the ground plans on the stage area (Q303) Removed claim: ESCO description (P12): Interpret the designs and other scenic drawings to clearly mark the information from the ground plans to the stage area., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -451 Prevent technical problems with stage equipment (Q302) Removed claim: ESCO description (P12): Anticipate possible problems with mechanical and electromechanical stage equipment., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +101 Perform first fire intervention (Q546) Added [it] label: effettuare il primo intervento antincendio
- 14:05, 3 July 2024 diff hist -428 Prevent technical problems with scenic elements (Q301) Removed claim: ESCO description (P12): Anticipate possible technical problems with scenic elements., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -439 Assemble the rehearsal set (Q300) Removed claim: ESCO description (P12): Put together all prepared scenic elements to prepare the rehearsal set., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +110 Prevent fire in a performance environment (Q545) Added [it] label: prevenire gli incendi negli ambienti per spettacoli
- 14:05, 3 July 2024 diff hist -457 Assemble scenic elements on stage (Q299) Removed claim: ESCO description (P12): Fix scenic elements, dance and stage floors and stage cloths, based on written documents., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -485 Set up technical stage equipment (Q298) Removed claim: ESCO description (P12): Install mechanical and technical stage equipment. Test the installation to make sure everything is in working order., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +84 Provide first aid (Q544) Added [it] label: fornire il primo soccorso
- 14:05, 3 July 2024 diff hist -502 Provide documentation (Q297) Removed claim: ESCO description (P12): Prepare and distribute documentation to ensure all people involved in the production receive relevant and up‐to‐date information., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -466 Draw stage layouts (Q296) Removed claim: ESCO description (P12): Sketch or manually draw stage layouts, which depicts the arrangement of various elements on stage., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +124 React to emergency situations in a live performance environment (Q543) Added [it] label: reagire a situazioni di emergenza durante uno spettacolo dal vivo
- 14:05, 3 July 2024 diff hist -528 Use communication equipment (Q295) Removed claim: ESCO description (P12): Set up, test and operate different types of communication equipment such as transmission equipment, digital network equipment, or telecommunications equipment., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -419 Tune up wireless audio systems (Q294) Removed claim: ESCO description (P12): Adjust a wireless audio system in a live situation., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +109 Use personal protection equipment (Q541) Added [it] label: utilizzare i dispositivi di protezione individuale
- 14:05, 3 July 2024 diff hist -505 Edit recorded sound (Q293) Removed claim: ESCO description (P12): Arrange audio footage using a variety of software, tools and techniques such as crossfading, speed effects and removing unwanted noises., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -547 Record music (Q292) Removed claim: ESCO description (P12): Register a sound or musical performance in a studio or live environment. Use the appropriate equipment and your professional judgment to capture the sounds with optimal fidelity., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +89 Work ergonomically (Q540) Added [it] label: lavorare in maniera ergonomica
- 14:05, 3 July 2024 diff hist -450 Set up a multiâ track recording (Q291) Removed claim: ESCO description (P12): Make the necessary preparations to record music or other sounds on several tracks., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -497 Set up basic recording (Q290) Removed claim: ESCO description (P12): Put up a basic stereo audio recording system, which mostly includes amplifiers, speakers and one or more types of music sources., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +118 Follow safety procedures when working at heights (Q513) Added [it] label: seguire le procedure di sicurezza durante i lavori in quota
- 14:05, 3 July 2024 diff hist -428 Plan a recording (Q289) Removed claim: ESCO description (P12): Make the necessary arrangements to record music in a studio., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist -435 Monitor mixing in a live situation (Q288) Removed claim: ESCO description (P12): Oversee mixing in a live audio situation, under own responsibility., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:05, 3 July 2024 diff hist +62 Plot lighting states (Q530) Added [it] label: 1.08
- 14:05, 3 July 2024 diff hist -459 Mix sound in a live situation (Q287) Removed claim: ESCO description (P12): Combine audio signals from multiple sound sources during rehearsals or in a live situation., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:04, 3 July 2024 diff hist -456 Maintain sound equipment (Q286) Removed claim: ESCO description (P12): Set up, check, maintain and repair sound equipment for a live performance establishment., #quickstatements; #temporary_batch_1720015493816 Tag: purkii [2.0]
- 14:04, 3 July 2024 diff hist +123 Prevent undesired changes to sound design (Q571) Added [it] label: prevenire le modifiche indesiderate alla progettazione del suono