Setup equipment in timely manner (Q257)

From CompetenceBase
Revision as of 10:14, 19 September 2024 by ChrisVanGoethem (talk | contribs) (‎Created claim: Property:P62: limited to the physical placement of the temporary equipment.)

Make sure to set up equipment according to deadlines and time schedules.

Make sure to set up equipment according to deadlines and time schedules.
  • 00 00 00 04 30 TE
Language Label Description Also known as
English
Setup equipment in timely manner
Make sure to set up equipment according to deadlines and time schedules.
  • 00 00 00 04 30 TE

Statements

0 references
00 00 00 04 30
0 references
0 references
Transport, place, move, stack and transport technical performance equipment and materials according to the needs during the fit up. (English)
0 references
Inspect the technical performance equipment visually for damage, wear and tear. (English)
0 references
Mount and rig technical performance equipment according to instructions and/or plans. (English)
0 references
Take safety precautions when working at or below heights. (English)
0 references
Check that technical performance equipment and objects can move freely during different operations when needed. (English)
0 references
Immobilize technical performance equipment once in place. (English)
0 references
Secure technical performance equipment and accessories. (English)
0 references
Check that all technical performance equipment is secured according to safety procedures. (English)
0 references
Take action if something goes wrong or is unsafe. (English)
0 references
Report if something is not performed according to the agreed procedures. (English)
0 references
Principles of mechanics. (English)
0 references
Identifying and checking technical performance equipment. (English)
0 references
Suspension systems. (English)
0 references
I don't know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I am uncertain how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I am more than able to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... doesn't know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... is uncertain how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... knows how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... is more than able to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
ETTE - European Theatre Technicians Education; Fit up and rig performance equipment, Chapter 10-1
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2g) Select and use work equipment, especially ladders, scaffolding and tools – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF)
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 3) Setting up, bringing into service, connecting, and operating equipment – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF
0 references
Netherlands Qualification File Stage and Event Technology, crebonumber 79040, learning area B1-K1-W3 Plaatst en hangt licht, geluids-, beeldapparatuur en (overige) materialen in. SBB, Sectorchambre ICT and Creative Industry, version 2022 (to be released August 2022), Zoetermeer 2021.
0 references
0 references
TE
0 references
excludes the building, using and hanging of the suspension constructions. (English)
0 references
limited to the physical placement of the temporary equipment. (English)
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata