Difference between revisions of "Manage sign-off of an installed system (Q397)"
From CompetenceBase
(Created claim: acceptable assessment methods (P31): criterion based Interview (Q33)) | (Created claim: training (P22): It is a good idea to integrate this competence within other activities, such a a build-up.) | ||
Property / training | |||
+ | It is a good idea to integrate this competence within other activities, such a a build-up. (English) | ||
Property / training: It is a good idea to integrate this competence within other activities, such a a build-up. (English) / rank | |||
+ | Normal rank |
Latest revision as of 09:53, 20 September 2024
Make sure an installed technical system is adequately transferred and signed off for.
- 70 61 00 04 10 TE
Language | Label | Description | Also known as |
---|---|---|---|
English | Manage sign-off of an installed system | Make sure an installed technical system is adequately transferred and signed off for. |
|
Statements
70 61 00 04 10
0 references
10
0 references
I don't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I am uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I am more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... doesn't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... is uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... knows how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... is more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
check if the system functions (English)
0 references
check the safety requirements of the system used (English)
0 references
ensure the quality of the work done (English)
0 references
adequately transfer the system (safety, functioning, attention points...) (English)
0 references
document the set-up and specific attention points (English)
0 references
handle the signing off (English)
0 references
understands the system(s) and system layout (English)
0 references
knows the documentation regulations (English)
0 references
TE
0 references
It is a good idea to integrate this competence within other activities, such a a build-up. (English)
0 references