Difference between revisions of "Manage sign-off of an installed system (Q397)"

From CompetenceBase

Make sure an installed technical system is adequately transferred and signed off for.

(‎Created claim: training (P22): It is a good idea to integrate this competence within other activities, such a a build-up.)
 
(2 intermediate revisions by the same user not shown)
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: structured portfolio / rank
 +
Normal rank
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: criterion based Interview / rank
 +
Normal rank
Property / training
 +
It is a good idea to integrate this competence within other activities, such a a build-up. (English)
Property / training: It is a good idea to integrate this competence within other activities, such a a build-up. (English) / rank
 +
Normal rank

Latest revision as of 09:53, 20 September 2024

Make sure an installed technical system is adequately transferred and signed off for.
  • 70 61 00 04 10 TE
Language Label Description Also known as
English
Manage sign-off of an installed system
Make sure an installed technical system is adequately transferred and signed off for.
  • 70 61 00 04 10 TE

Statements

0 references
70 61 00 04 10
0 references
0 references
0 references
0 references
I don't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I am uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
I am more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... doesn't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... is uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... knows how to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
... is more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
0 references
check if the system functions (English)
0 references
check the safety requirements of the system used (English)
0 references
ensure the quality of the work done (English)
0 references
adequately transfer the system (safety, functioning, attention points...) (English)
0 references
document the set-up and specific attention points (English)
0 references
handle the signing off (English)
0 references
understands the system(s) and system layout (English)
0 references
knows the documentation regulations (English)
0 references
0 references
TE
0 references
It is a good idea to integrate this competence within other activities, such a a build-up. (English)
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata