Difference between revisions of "Store performance equipment (Q260)"
From CompetenceBase
(Created claim: references (P23): Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2m) Hand over devices, system parts, components and other work equipment, and document loss, damage, or defects, Check the equipment for missing parts and damage, Prepare devices for return, Use protocols and checklists – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungst...) | (Created claim: training (P22): It is necessary that routines in different situations and environments are performed.) | ||
(34 intermediate revisions by 2 users not shown) | |||
label / nl | label / nl | ||
+ | uitrusting van een voorstelling opslaan | ||
label / it | label / it | ||
+ | smontare e immagazzinare l’attrezzatura per gli spettacoli | ||
label / de | label / de | ||
+ | Ausrüstung für Vorstellungen lagern | ||
aliases / en / 0 | aliases / en / 0 | ||
+ | 00 00 50 03 20 TE | ||
description / nl | description / nl | ||
+ | Geluids-, licht- en videoapparatuur na een voorstelling/opvoering veilig ontmantelen. Ervoor zogen dat de apparatuur op correcte wijze wordt opgeslagen. | ||
description / it | description / it | ||
+ | Smontare in modo sicuro le apparecchiature audio, di illuminazione e video dopo uno spettacolo. Assicurarsi che le attrezzature siano immagazzinate in modo corretto.. | ||
description / de | description / de | ||
+ | Sichere Demontage von Ton-, Beleuchtungs- und Videoausrüstung nach einer Aufführung. Sicheres Lagern der Ausrüstung. | ||
Property / ESCO title | |||
- | |||
Property / ESCO title: Store performance equipment (English) / rank | |||
- | |||
Property / ESCO title | |||
- | |||
Property / ESCO title: Ausrüstung für Vorstellungen lagern (German) / rank | |||
- | |||
Property / ESCO title | |||
- | |||
Property / ESCO title: uitrusting van een voorstelling opslaan (Dutch) / rank | |||
- | |||
Property / ESCO title | |||
- | |||
Property / ESCO title: smontare e immagazzinare l’attrezzatura per gli spettacoli (Italian) / rank | |||
- | |||
Property / field and subfield | |||
- | |||
Property / field and subfield: General / rank | |||
- | |||
Property / ESCO description | |||
- | |||
Property / ESCO description: Dismantle sound, light and video equipment in a safe manner after a performance event. Make sure the equipment is correctly stored away. (English) / rank | |||
- | |||
Property / ESCO description | |||
- | |||
Property / ESCO description: Sichere Demontage von Ton-, Beleuchtungs- und Videoausrüstung nach einer Aufführung. Sicheres Lagern der Ausrüstung. (German) / rank | |||
- | |||
Property / ESCO description | |||
- | |||
Property / ESCO description: Geluids-, licht- en videoapparatuur na een voorstelling/opvoering veilig ontmantelen. Ervoor zogen dat de apparatuur op correcte wijze wordt opgeslagen. (Dutch) / rank | |||
- | |||
Property / ESCO description | |||
- | |||
Property / ESCO description: Smontare in modo sicuro le apparecchiature audio, di illuminazione e video dopo uno spettacolo. Assicurarsi che le attrezzature siano immagazzinate in modo corretto.. (Italian) / rank | |||
- | |||
Property / ESCO version | |||
- | |||
Property / ESCO version: 1.08 / rank | |||
- | |||
Property / field and subfield | |||
+ | |||
Property / field and subfield: General, General / rank | |||
+ | Normal rank | ||
Property / acceptable assessment methods | |||
+ | |||
Property / acceptable assessment methods: observation in simulated environment / rank | |||
+ | Normal rank | ||
Property / owner | |||
+ | |||
Property / owner: TeBeVat / rank | |||
+ | Normal rank | ||
Property / owner code | |||
+ | TE | ||
Property / owner code: TE / rank | |||
+ | Normal rank | ||
Property / ESCO Skill/Competence | |||
+ | |||
Property / ESCO Skill/Competence: Store performance equipment / rank | |||
+ | Normal rank | ||
Property / scope note | |||
+ | Excludes the dismantling of the suspension constructions. (English) | ||
Property / scope note: Excludes the dismantling of the suspension constructions. (English) / rank | |||
+ | Normal rank | ||
Property / scope note | |||
+ | Limited to the physical removal of the temporary equipment. (English) | ||
Property / scope note: Limited to the physical removal of the temporary equipment. (English) / rank | |||
+ | Normal rank | ||
Property / scope note | |||
+ | Excludes the electrical connections (which are dealt with in the competence on mobile electricity).Excludes the electrical connections (which are dealt with in the competence on mobile electricity). (English) | ||
Property / scope note: Excludes the electrical connections (which are dealt with in the competence on mobile electricity).Excludes the electrical connections (which are dealt with in the competence on mobile electricity). (English) / rank | |||
+ | Normal rank | ||
Property / autonomy / attitude | |||
+ | |||
Property / autonomy / attitude: Aware of movements around you / rank | |||
+ | Normal rank | ||
Property / autonomy / attitude | |||
+ | |||
Property / autonomy / attitude: Awareness of raised levels of risk / rank | |||
+ | Normal rank | ||
Property / autonomy / attitude | |||
+ | |||
Property / autonomy / attitude: Respect for the equipment / rank | |||
+ | Normal rank | ||
Property / autonomy / attitude | |||
+ | |||
Property / autonomy / attitude: Respect for safety warnings and instructions / rank | |||
+ | Normal rank | ||
Property / autonomy / attitude | |||
+ | |||
Property / autonomy / attitude: Accuracy / rank | |||
+ | Normal rank | ||
Property / training | |||
+ | It is necessary that routines in different situations and environments are performed. (English) | ||
Property / training: It is necessary that routines in different situations and environments are performed. (English) / rank | |||
+ | Normal rank |
Latest revision as of 10:48, 19 September 2024
Dismantle sound, light and video equipment in a safe manner after a performance event. Make sure the equipment is correctly stored away.
- 00 00 50 03 20 TE
Language | Label | Description | Also known as |
---|---|---|---|
English | Store performance equipment | Dismantle sound, light and video equipment in a safe manner after a performance event. Make sure the equipment is correctly stored away. |
|
Statements
00 00 50 03 20
0 references
20
0 references
Demobilize technical performance equipment once in place. (English)
0 references
Transport, place, move, stack and transport technical performance equipment and materials according to the needs during dismantling. (English)
0 references
Inspect the technical performance equipment visually for damage, wear and tear after use. (English)
0 references
Dismantle and de-rig performance equipment according to instructions and/or plans. (English)
0 references
Take safety precautions when working at or below heights. (English)
0 references
Secure technical performance equipment and accessories when storing. (English)
0 references
Check that all technical performance equipment is secured according to safety procedures. (English)
0 references
Report if something is not performed according to the agreed procedures. (English)
0 references
Proper storage procedures (English)
0 references
Safety procedures (weight/PPE) (English)
0 references
Electrical Risks (English)
0 references
I don't know how to dismantle sound, light and video equipment in a safely manner after a performance event nor do I know how to make sure the equipment is correctly stored away. (English)
0 references
I am uncertain how to dismantle sound, light and video equipment in a safely manner after a performance event. I have difficulties making sure the equipment is correctly stored away. (English)
0 references
I know how to dismantle sound, light and video equipment in a safely manner after a performance event. I know how to make sure the equipment is correctly stored away. (English)
0 references
I am more than able to dismantle sound, light and video equipment in a safely manner after a performance event and I know how to make sure the equipment is correctly stored away. (English)
0 references
... doesn't know how to dismantle sound, light and video equipment in a safely manner after a performance event nor does ... know how to make sure the equipment is correctly stored away. (English)
0 references
... is uncertain how to dismantle sound, light and video equipment in a safely manner after a performance event. ... has difficulties making sure the equipment is correctly stored away. (English)
0 references
... knows how to dismantle sound, light and video equipment in a safely manner after a performance event. ... knows how to make sure the equipment is correctly stored away. (English)
0 references
... is more than able to dismantle sound, light and video equipment in a safely manner after a performance event and ... knows how to make sure the equipment is correctly stored away. (English)
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2l) Dismantle systems and structures, Pack equipment for transport – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF)
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2m) Hand over devices, system parts, components and other work equipment, and document loss, damage, or defects, Check the equipment for missing parts and damage, Prepare devices for return, Use protocols and checklists – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF)
0 references
TE
0 references
Excludes the dismantling of the suspension constructions. (English)
0 references
Limited to the physical removal of the temporary equipment. (English)
0 references
Excludes the electrical connections (which are dealt with in the competence on mobile electricity).Excludes the electrical connections (which are dealt with in the competence on mobile electricity). (English)
0 references
It is necessary that routines in different situations and environments are performed. (English)
0 references