Difference between revisions of "technically design monitoring system (Q741)"

From CompetenceBase

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. (ESSENCE)

(‎Changed [nl] label: technisch ontwerp monitor systeem)
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Technically design a sound system / rank
 +
Normal rank
Property / ESCO Skill/Competence: Technically design a sound system / qualifier
 +
note: broader concept

Revision as of 15:00, 15 August 2024

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. (ESSENCE)
  • 02 00 10 05 25 ES
Language Label Description Also known as
English
technically design monitoring system
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. (ESSENCE)
  • 02 00 10 05 25 ES

Statements

0 references
0 references
9
0 references
0 references
0 references
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata