Difference between revisions of "technically design wireless system (Q740)"
From CompetenceBase
(Changed [nl] label: technisch ontwerp draadloos systeem) | (Created claim: ESCO Skill/Competence (P64): Technically design a sound system (Q539)) | ||
Property / ESCO Skill/Competence | |||
+ | |||
Property / ESCO Skill/Competence: Technically design a sound system / rank | |||
+ | Normal rank | ||
Property / ESCO Skill/Competence: Technically design a sound system / qualifier | |||
+ | note: broader concept |
Revision as of 14:59, 15 August 2024
Assess the wireless requirements of the production and design a solution for portable sources and in-ear receivers based on the locally available radio spectrum, taking into account the wireless needs of other departments, and coordinating with them.
- 02 30 10 05 10 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | technically design wireless system | Assess the wireless requirements of the production and design a solution for portable sources and in-ear receivers based on the locally available radio spectrum, taking into account the wireless needs of other departments, and coordinating with them. |
|
Statements
8
0 references
Plan a wireless audio system for portable microphones, and in-ear monitoring, based on the requirements of the production, possibly including and/or coordinating with portable intercom systems and the wireless requirements of other departments. Select the optimal equipment from the available pool. (English)
0 references
10
0 references
determine required use cases (portable mic, in-ear, intercom use) (English)
0 references
determine type and amount of transmitters, receivers and antennas (English)
0 references
consider local spectrum regulations (English)
0 references
consider external disturbances (English)
0 references
consider interactions between local transmitters (English)
0 references
use common software tools for frequency planning to prevent intermodulation problems (English)
0 references
write up technical documentation (English)
0 references
write up spectrum requirements and frequency plan (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 30 10 05 10
0 references