Difference between revisions of "set up signal distribution system (Q744)"
From CompetenceBase
(Created claim: ESCO Skill/Competence (P64): Fit up sound on stage (Q565), #quickstatements; #temporary_batch_1723723592568) | (Removed claim: import id (P39): 14, #quickstatements; #temporary_batch_1724141793623) | ||||||
Property / import id | |||||||
- | 14
| ||||||
Property / import id: 14 / rank | |||||||
- |
Latest revision as of 08:17, 20 August 2024
Implement a signal distribution system on-site according to an existing design, adapt the design to local conditions where necessary, and thoroughly test and troubeshoot the system. (ESSENCE)
- 02 00 20 05 12 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | set up signal distribution system | Implement a signal distribution system on-site according to an existing design, adapt the design to local conditions where necessary, and thoroughly test and troubeshoot the system. (ESSENCE) |
|
Statements
12
0 references
follow technical design (English)
0 references
consider using local signal infrastructure if appropriate (English)
0 references
run cables safely and neatly (English)
0 references
avoid induction and interference (English)
0 references
configure common network equipment (English)
0 references
label connectors where necessary (English)
0 references
connect a unit to a local network (English)
0 references
manually set correct IP address and netmask (English)
0 references
determine the default router and set it correctly (English)
0 references
configure device for automatic setup (English)
0 references
check sub-systems in an incremental and systematic way (English)
0 references
configure signal routing hardware (English)
0 references
02 00 20 05 12
0 references
supersedes (English)
0 references