Difference between revisions of "fit up and rig performance equipment (Q782)"

From CompetenceBase

unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor (ETTEC)

(‎Changed [en] label: fit up and rig performance equipment)
(‎Removed claim: import id (P39): 61, #quickstatements; #temporary_batch_1724141793623)
 
(3 intermediate revisions by the same user not shown)
label / delabel / de
-
Ausrüstung für Vorstellungen aufbauen und anpassen (ETTEC)
+
Ausrüstung für Vorstellungen aufbauen und anpassen
Property / import id
-

61

Amount61
Unit1
 
Property / import id: 61 / rank
-
Normal rank
 
Property / unique identifierProperty / unique identifier
-
60 00 00 03 10 ET
+
60 00 00 03 10
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Assemble performance equipment / rank
 +
Normal rank

Latest revision as of 08:17, 20 August 2024

unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor (ETTEC)
  • 60 00 00 03 10 ET
Language Label Description Also known as
English
fit up and rig performance equipment
unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor (ETTEC)
  • 60 00 00 03 10 ET

Statements

0 references
0 references
ETTE handbook, CH 10
0 references
0 references
Transports, places, moves, stacks and transports technical performance equipment and materials according to the needs during the fit up. (English)
0 references
Inspects the technical performance equipment visually for damage, wear and tear. (English)
0 references
Mounts and rigs technical performance equipment according to instructions and/or plans. (English)
0 references
Takes safety precautions when working at or below heights. (English)
0 references
Checks that technical performance equipment and objects can move freely during different operations when needed. (English)
0 references
Immobilizes technical performance equipment once in place. (English)
0 references
Secures technical performance equipment and accessories. (English)
0 references
Checks that all technical performance equipment is secured according to safety procedures. (English)
0 references
Takes action if something goes wrong or is unsafe. (English)
0 references
Reports if something is not performed according to the agreed procedures. (English)
0 references
60 00 00 03 10
0 references
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata