Difference between revisions of "set up monitoring system (Q746)"

From CompetenceBase

Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artistsperformersspeakers. Test, measure, and fine-tune. (ESSENCE)

(‎Changed [nl] label: monitor systeem opzetten)
(‎Removed claim: import id (P39): 16, #quickstatements; #temporary_batch_1724141793623)
 
(One intermediate revision by the same user not shown)
Property / import id
-

16

Amount16
Unit1
 
Property / import id: 16 / rank
-
Normal rank
 
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Fit up sound on stage / rank
 +
Normal rank

Latest revision as of 08:17, 20 August 2024

Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artistsperformersspeakers. Test, measure, and fine-tune. (ESSENCE)
  • 02 00 20 05 14 ES
Language Label Description Also known as
English
set up monitoring system
Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artistsperformersspeakers. Test, measure, and fine-tune. (ESSENCE)
  • 02 00 20 05 14 ES

Statements

0 references
0 references
0 references
0 references
follow technical design (English)
0 references
follow stage plan (English)
0 references
adapt design to local conditions (English)
0 references
cater to the monitoring needs of artists (English)
0 references
02 00 20 05 14
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata