Difference between revisions of "Set up signal distribution system (Q744)"
From CompetenceBase
(Created claim: place in process (P28): preparation (Q203), #quickstatements; #temporary_batch_1720596369061) | (Created claim: EQF level (P17): EQF 5 (Q208), #quickstatements; #temporary_batch_1720596475241) | ||
| Property / EQF level | |||
| + | |||
| Property / EQF level: EQF 5 / rank | |||
| + | Normal rank | ||
Revision as of 07:28, 10 July 2024
Implement a signal distribution system on-site according to an existing design, adapt the design to local conditions where necessary, and thoroughly test and troubeshoot the system.
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Set up signal distribution system | Implement a signal distribution system on-site according to an existing design, adapt the design to local conditions where necessary, and thoroughly test and troubeshoot the system. |
Statements
14
0 references