assess power needs (Q849)

From CompetenceBase
Revision as of 08:17, 20 August 2024 by Purkertcz (talk | contribs) (‎Removed claim: Property:P39: 37, #quickstatements; #temporary_batch_1724141793623)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES

Statements

0 references
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata