technically design wireless system (Q740)

From CompetenceBase
Revision as of 10:03, 15 August 2024 by Purkertcz (talk | contribs) (‎Changed [de] label: ein Drahtlossystem planen)

Assess the wireless requirements of the production and design a solution for portable sources and in-ear receivers based on the locally available radio spectrum, taking into account the wireless needs of other departments, and coordinating with them.

Assess the wireless requirements of the production and design a solution for portable sources and in-ear receivers based on the locally available radio spectrum, taking into account the wireless needs of other departments, and coordinating with them.
  • 02 30 10 05 10 ES
Language Label Description Also known as
English
technically design wireless system
Assess the wireless requirements of the production and design a solution for portable sources and in-ear receivers based on the locally available radio spectrum, taking into account the wireless needs of other departments, and coordinating with them.
  • 02 30 10 05 10 ES

Statements

0 references
0 references
8
0 references
Plan a wireless audio system for portable microphones, and in-ear monitoring, based on the requirements of the production, possibly including and/or coordinating with portable intercom systems and the wireless requirements of other departments. Select the optimal equipment from the available pool. (English)
0 references
0 references
0 references
0 references
determine required use cases (portable mic, in-ear, intercom use) (English)
0 references
determine type and amount of transmitters, receivers and antennas (English)
0 references
consider local spectrum regulations (English)
0 references
consider external disturbances (English)
0 references
consider interactions between local transmitters (English)
0 references
use common software tools for frequency planning to prevent intermodulation problems (English)
0 references
write up technical documentation (English)
0 references
write up spectrum requirements and frequency plan (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 30 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata