assess power needs (ESSENCE) (Q849)

From CompetenceBase
Revision as of 17:26, 21 July 2024 by JoernNettingsmeier (talk | contribs) (‎Changed [de] label: den Elektrizitätsbedarf ermitteln (ESSENCE))

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs (ESSENCE)
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.
  • 11 20 10 05 10 ES

Statements

0 references
0 references
37
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata