Fit up and rig performance equipment (Q782)

From CompetenceBase
Revision as of 07:54, 10 July 2024 by Purkertcz (talk | contribs) (‎Created claim: Property:P27: Immobilizes technical performance equipment once in place., #quickstatements; #temporary_batch_1720597940948)

Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.

Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.
Language Label Description Also known as
English
Fit up and rig performance equipment
Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.

    Statements

    0 references
    0 references
    61
    0 references
    0 references
    ETTE handbook, CH 10
    0 references
    0 references
    Transports, places, moves, stacks and transports technical performance equipment and materials according to the needs during the fit up. (English)
    0 references
    Inspects the technical performance equipment visually for damage, wear and tear. (English)
    0 references
    Mounts and rigs technical performance equipment according to instructions and/or plans. (English)
    0 references
    Takes safety precautions when working at or below heights. (English)
    0 references
    Checks that technical performance equipment and objects can move freely during different operations when needed. (English)
    0 references
    Immobilizes technical performance equipment once in place. (English)
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata