high rigger (Q1198)

From CompetenceBase
Revision as of 10:46, 20 August 2024 by Purkertcz (talk | contribs) (‎Created claim: Property:P78: 40, #quickstatements; #temporary_batch_1724150742104)

High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations.

High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations.
Language Label Description Also known as
English
high rigger
High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations.

    Statements

    0 references
    80
    0 references
    0 references
    high rigger (English)
    High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations. Their job can include rope access, working above colleagues, assemble constructions to lift performers and lifting heavy loads, which makes it a high risk occupation. They work indoor as well as outdoor. They cooperate with ground riggers to unload and assemble constructions on ground level. (English)
    0 references
    7215.2.3
    0 references
    40
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata