Fit up and rig performance equipment (Q782)
From CompetenceBase
Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.
- 60 00 00 03 10 ET
Language | Label | Description | Also known as |
---|---|---|---|
English | Fit up and rig performance equipment | Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor. |
|
Statements
61
0 references
10
0 references
ETTE handbook, CH 10
0 references
Transports, places, moves, stacks and transports technical performance equipment and materials according to the needs during the fit up. (English)
0 references
Inspects the technical performance equipment visually for damage, wear and tear. (English)
0 references
Mounts and rigs technical performance equipment according to instructions and/or plans. (English)
0 references
Takes safety precautions when working at or below heights. (English)
0 references
Checks that technical performance equipment and objects can move freely during different operations when needed. (English)
0 references
Immobilizes technical performance equipment once in place. (English)
0 references
Secures technical performance equipment and accessories. (English)
0 references
Checks that all technical performance equipment is secured according to safety procedures. (English)
0 references
Takes action if something goes wrong or is unsafe. (English)
0 references
Reports if something is not performed according to the agreed procedures. (English)
0 references
60 00 00 03 10 ET
0 references