Difference between revisions of "assess power needs (Q849)"

From CompetenceBase

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)

(‎Added qualifier: ESCO description (P12): Die benötigte elektrische Gesamtleistung einer Produktion oder Abteilung ermitteln und die Positionen und Dimensionierung elektrischer Anschlüsse festlegen., #quickstatements; #temporary_batch_1733403462879)
(‎Added qualifier: ESCO version (P15): n.a, #quickstatements; #temporary_batch_1733403462879)
Property / ESCO title: den Elektrizitätsbedarf ermitteln (German) / qualifier
 +

Revision as of 13:12, 5 December 2024

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES

Statements

0 references
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references
den Elektrizitätsbedarf ermitteln (German)
Die benötigte elektrische Gesamtleistung einer Produktion oder Abteilung ermitteln und die Positionen und Dimensionierung elektrischer Anschlüsse festlegen. (German)
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata