Difference between revisions of "high rigger (Q1198)"
From CompetenceBase
(Created claim: ESCO Scope note (P13): Includes circus rigging. Includes similar activities in event and rental companies. Excludes riggers who are not qualified to work at heights. Excludes industrial rigging., #quickstatements; #temporary_batch_1724228924232) | (Created claim: ISCO number (P79): 7215, #quickstatements; #temporary_batch_1724229049077) | ||
Property / ISCO number | |||
+ | 7215 | ||
Property / ISCO number: 7215 / rank | |||
+ | Normal rank |
Revision as of 08:31, 21 August 2024
High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations.
Language | Label | Description | Also known as |
---|---|---|---|
English | high rigger | High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations. |
Statements
80
0 references
high rigger (English)
High riggers assemble and hoist temporary suspension structures on heights to support performance equipment. Their work is based on instruction, plans and calculations. Their job can include rope access, working above colleagues, assemble constructions to lift performers and lifting heavy loads, which makes it a high risk occupation. They work indoor as well as outdoor. They cooperate with ground riggers to unload and assemble constructions on ground level. (English)
0 references
7215.2.3
0 references
40
0 references
1.2.0
0 references
Includes circus rigging. Includes similar activities in event and rental companies. Excludes riggers who are not qualified to work at heights. Excludes industrial rigging. (English)
0 references
7215
0 references