Difference between revisions of "assess power needs (Q849)"

From CompetenceBase

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)

(‎Created claim: ESCO Skill/Competence (P64): Assess power needs (Q490), #quickstatements; #temporary_batch_1723723592568)
(‎Removed claim: import id (P39): 37, #quickstatements; #temporary_batch_1724141793623)
 
Property / import id
-

37

Amount37
Unit1
 
Property / import id: 37 / rank
-
Normal rank
 

Latest revision as of 08:17, 20 August 2024

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES

Statements

0 references
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata