Difference between revisions of "technically design monitoring system (Q741)"

From CompetenceBase

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.

(‎Changed [de] label: Bühnenmonitoring-System planen)
(‎Removed claim: import id (P39): 9, #quickstatements; #temporary_batch_1724141793623)
 
Property / import id
-

9

Amount9
Unit1
 
Property / import id: 9 / rank
-
Normal rank
 

Latest revision as of 08:17, 20 August 2024

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES
Language Label Description Also known as
English
technically design monitoring system
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES

Statements

0 references
0 references
0 references
0 references
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata