Difference between revisions of "Manage sign-off of an installed system (ESCO) (Q625)"

From CompetenceBase

Make sure an installed technical system is adequately transferred and signed off for. (ESCO)

(‎Added [it] description: Assicurarsi che un sistema tecnico installato sia trasferito e autorizzato in modo adeguato.)
(‎Changed [en] description: Make sure an installed technical system is adequately transferred and signed off for. (ESCO))
description / endescription / en
-
Make sure an installed technical system is adequately transferred and signed off for.
+
Make sure an installed technical system is adequately transferred and signed off for. (ESCO)

Revision as of 10:28, 6 August 2024

Make sure an installed technical system is adequately transferred and signed off for. (ESCO)
Language Label Description Also known as
English
Manage sign-off of an installed system (ESCO)
Make sure an installed technical system is adequately transferred and signed off for. (ESCO)

    Statements

    0 references
    0 references
    70 61 00 04 10
    0 references
    1.08
    0 references
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata