Difference between revisions of "Install temporary audience accommodation (Q313)"
From CompetenceBase
(Removed claim: ESCO title (P11): tijdelijke tribunes voor publiek optrekken, #quickstatements; #temporary_batch_1720014683655) | (Removed claim: ESCO title (P11): temporäre Unterkünfte für das Publikum einrichten, #quickstatements; #temporary_batch_1720014846766) | ||
Property / ESCO title | |||
- | |||
Property / ESCO title: temporäre Unterkünfte für das Publikum einrichten (German) / rank | |||
- |
Revision as of 13:55, 3 July 2024
Place audience accommodation, fixing it into place with a scaffolding system if required.
- 04 50 20 03 50 TE
Language | Label | Description | Also known as |
---|---|---|---|
English | Install temporary audience accommodation | Place audience accommodation, fixing it into place with a scaffolding system if required. |
|
Statements
04 50 20 03 50
0 references
Install temporary audience accommodation (English)
0 references
fissare la copertura di un tetto (Italian)
0 references
Place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
Unterbringung des Publikums, gegebenenfalls Fixierung mittels eines Gerüstsystems. (German)
0 references
De huisvesting van het publiek tot stand brengen, indien nodig met een steigersysteem. (Dutch)
0 references
Fissare in modo sicuro la copertura di un tetto su una costruzione temporanea per ripararsi dalla pioggia e da altre intemperie. (Italian)
0 references
50
0 references
I don't know how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
I am uncertain how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
I know how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
I am more than able to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
... doesn't know how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
... is uncertain how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
... knows how to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
... is more than able to place audience accommodation, fixing it into place with a scaffolding system if required. (English)
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2i) Set up and secure components for supporting structures, in particular scaffolding and trusses as well as stage, grandstand, scene and exhibition setups, Select components from the material pool and carry out a visual inspection, Take differences in assembly requirements into account, Comply with the requirements for truss elements and connectors, Assess different truss systems, Comply with structural requirements – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF)
0 references
Transport, place, move, stack and transport riser, platform or scaffolding materials according to the needs during the set up. (English)
0 references
Inspect the riser, platform or scaffolding materials visually for damage, wear and tear. (English)
0 references
Mount and rig temporary audience accommodations according to instructions and/or plans. (English)
0 references
Take safety precautions when working at or below heights. (English)
0 references
Secure riser, platform or scaffolding materials once in place. (English)
0 references
Check that all temporary audience accommodations is built according to safety procedures and manufacturers guidelines. (English)
0 references
Take action if something goes wrong or is unsafe. (English)
0 references
Report if something is not performed according to the agreed procedures. (English)
0 references
Basic knowledge about riser, platform or scaffolding materials (English)
0 references
Handling of riser, platform or scaffolding materials (English)
0 references
Methods of assembling riser, platform or scaffolding materials (English)
0 references
Basic knowledge of regulations of temporary audience accommodations (English)
0 references
Basic knowledge of temporary audience accommodations (English)
0 references
Basic knowledge of floor loading capacities (English)
0 references
Basic knowledge technical specifications of temporary audience accommodation (English)
0 references
TE
0 references