Difference between revisions of "technically design signal distribution system (ESSENCE) (Q738)"
From CompetenceBase
(Added [de] label: ein Signalverteilungssystem planen (ESSENCE)) | (Changed [en] description: Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site.) | ||
description / en | description / en | ||
- | + | Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. |
Revision as of 16:43, 21 July 2024
Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site.
- 02 00 10 05 22 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | technically design signal distribution system (ESSENCE) | Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. |
|
Statements
6
0 references
Plan a signal distribution system based on the requirements of the production, the layout of the venue, and any existing media infrastructure. Such a system include digital point-to-point links or complex data networks, signal routing hardware, digital clocking, as well as analog lines and multicore systems. Create comprehensive documentation and distribute to all stakeholders. (English)
0 references
22
0 references
identify required input/output stations and their locations (English)
0 references
evaluate number of inputs and outputs per station (English)
0 references
define signal cabling on stage (English)
0 references
evaluate signal routing requirements (English)
0 references
evaluate and consider using existing infrastructure of the venue (English)
0 references
evaluate reliability requirements (English)
0 references
evaluate clocking requirements (English)
0 references
define cable runs, avoiding induction and interference (English)
0 references
define signal distribution and routing (English)
0 references
define clocking infrastructure (English)
0 references
define and write up network requirements (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 22
0 references