Difference between revisions of "Perform quality control of design during a run (Q394)"
From CompetenceBase
(Removed claim: ESCO description (P12): Kontrolle und Sicherstellung der Qualität der Konstruktionsergebnisse während eines Durchlaufs., #quickstatements; #temporary_batch_1720016841579) | (Removed claim: ESCO description (P12): Controllare e garantire la qualità dei risultati del progetto durante una prova., #quickstatements; #temporary_batch_1720017124813) | ||
Property / ESCO description | |||
- | |||
Property / ESCO description: Controllare e garantire la qualità dei risultati del progetto durante una prova. (Italian) / rank | |||
- |
Revision as of 14:34, 3 July 2024
Control and ensure the quality of design results during a run.
- 70 58 40 04 10 TE
Language | Label | Description | Also known as |
---|---|---|---|
English | Perform quality control of design during a run | Control and ensure the quality of design results during a run. |
|
Statements
70 58 40 04 10
0 references
Perform quality control of design during a run (English)
0 references
10
0 references
I don't know how to control and ensure the quality of design results during a run. (English)
0 references
I am uncertain how to control and ensure the quality of design results during a run. (English)
0 references
I know how to control and ensure the quality of design results during a run. (English)
0 references
I am more than able to control and ensure the quality of design results during a run. (English)
0 references
... doesn't know how to control and ensure the quality of design results during a run. (English)
0 references
... is uncertain how to control and ensure the quality of design results during a run. (English)
0 references
... knows how to control and ensure the quality of design results during a run. (English)
0 references
... is more than able to control and ensure the quality of design results during a run. (English)
0 references
TTTLPT - 30 10 40 01 Quality control of design results during a run
0 references
Check if the quality of the design concept is maintained (English)
0 references
Evaluate with the operators and production staff (English)
0 references
Propose alternatives or ameliorations (English)
0 references
Communicate with appropriate departments on maintenance needs (English)
0 references
The design concept (English)
0 references
Techniques and various technical solutions (English)
0 references
TE
0 references