Difference between revisions of "technically design a sound system (Q736)"

From CompetenceBase

Conceive and plan out a complex audio system, based on client requirements, event type, acoustics, and audience geometry, delegating subsystem planning if necessary. (ESSENCE)

(‎Created claim: skill (DE) (P70): technische Dokumentation zusammenstellen)
(‎Created claim: skill (DE) (P70): künstlerische und ästhetische Anforderungen bewerten)
 
(One intermediate revision by the same user not shown)
Property / skill (DE)
 +
Ressourcenbedarf zusammenstellen und kommunizieren: Strom, Lasten, Personal, Platzbedarf, Zeit, Wechselwirkung und Koordination mit anderen Gewerken, Transport, Lagerflächen
Property / skill (DE): Ressourcenbedarf zusammenstellen und kommunizieren: Strom, Lasten, Personal, Platzbedarf, Zeit, Wechselwirkung und Koordination mit anderen Gewerken, Transport, Lagerflächen / rank
 +
Normal rank
Property / skill (DE)
 +
künstlerische und ästhetische Anforderungen bewerten
Property / skill (DE): künstlerische und ästhetische Anforderungen bewerten / rank
 +
Normal rank

Latest revision as of 14:23, 19 September 2024

Conceive and plan out a complex audio system, based on client requirements, event type, acoustics, and audience geometry, delegating subsystem planning if necessary. (ESSENCE)
  • 02 00 10 05 20 ES
Language Label Description Also known as
English
technically design a sound system
Conceive and plan out a complex audio system, based on client requirements, event type, acoustics, and audience geometry, delegating subsystem planning if necessary. (ESSENCE)
  • 02 00 10 05 20 ES

Statements

0 references
0 references
0 references
0 references
0 references
We are retaining this as a category, but split it into several planning competences.
0 references
interpret construction drawings (English)
0 references
interpret technical riders (English)
0 references
understand artistic and aesthetic requirements (English)
0 references
understand production requirements (English)
0 references
consider budget constraints (English)
0 references
consider venue constraints (English)
0 references
coordinate subsystem planning (English)
0 references
collate equipment list (English)
0 references
collate technical documentation (English)
0 references
collate and communicate resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
evaluate artistic and aesthetic requirements (English)
0 references
02 00 10 05 20
0 references
Konstruktionszeichnungen interpretieren
0 references
technische Anweisungen interpretieren
0 references
künstlerische und ästhetische Anforderungen verstehen
0 references
Anforderungen der Produktion verstehen
0 references
Budget-Grenzen bedenken
0 references
Einschränkungen des Veranstaltungsorts beachten
0 references
Planung von Teilsystemen koordinieren
0 references
Materialliste zusammenstellen
0 references
technische Dokumentation zusammenstellen
0 references
Ressourcenbedarf zusammenstellen und kommunizieren: Strom, Lasten, Personal, Platzbedarf, Zeit, Wechselwirkung und Koordination mit anderen Gewerken, Transport, Lagerflächen
0 references
künstlerische und ästhetische Anforderungen bewerten
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata