Difference between revisions of "Setup equipment in timely manner (Q257)"

From CompetenceBase

Make sure to set up equipment according to deadlines and time schedules.

(‎Added [nl] label: uitrusting tijdig opzetten)
(‎Created claim: training (P22): It is necessary that routines in different situations and environments are performed.)
 
(23 intermediate revisions by 2 users not shown)
label / itlabel / it
 +
configurare le attrezzature in modo tempestivo
label / delabel / de
 +
Ausrüstung zum richtigen Zeitpunkt bereitstellen
description / nldescription / nl
 +
Ervoor zorgen dat u de uitrusting volgens deadlines en tijdschema's opzet.
description / itdescription / it
 +
Assicurarsi di configurare le apparecchiature in funzione delle scadenze e dei tempi previsti
description / dedescription / de
 +
Sicherstellen, dass Ausrüstung entsprechend den Fristen und Zeitplänen bereitstellt wird .
Property / ESCO title
-
Setup equipment in timely manner (English)
 
Property / ESCO title: Setup equipment in timely manner (English) / rank
-
Normal rank
 
Property / ESCO title
-
Ausrüstung zum richtigen Zeitpunkt bereitstellen (German)
 
Property / ESCO title: Ausrüstung zum richtigen Zeitpunkt bereitstellen (German) / rank
-
Normal rank
 
Property / ESCO title
-
uitrusting tijdig opzetten (Dutch)
 
Property / ESCO title: uitrusting tijdig opzetten (Dutch) / rank
-
Normal rank
 
Property / ESCO title
-
configurare le attrezzature in modo tempestivo (Italian)
 
Property / ESCO title: configurare le attrezzature in modo tempestivo (Italian) / rank
-
Normal rank
 
Property / ESCO description
-
Make sure to set up equipment according to deadlines and time schedules. (English)
 
Property / ESCO description: Make sure to set up equipment according to deadlines and time schedules. (English) / rank
-
Normal rank
 
Property / ESCO description
-
Sicherstellen, dass Ausrüstung entsprechend den Fristen und Zeitplänen bereitstellt wird. (German)
 
Property / ESCO description: Sicherstellen, dass Ausrüstung entsprechend den Fristen und Zeitplänen bereitstellt wird. (German) / rank
-
Normal rank
 
Property / ESCO description
-
Ervoor zorgen dat u de uitrusting volgens deadlines en tijdschema's opzet. (Dutch)
 
Property / ESCO description: Ervoor zorgen dat u de uitrusting volgens deadlines en tijdschema's opzet. (Dutch) / rank
-
Normal rank
 
Property / ESCO description
-
Assicurarsi di configurare le apparecchiature in funzione delle scadenze e dei tempi previsti. (Italian)
 
Property / ESCO description: Assicurarsi di configurare le apparecchiature in funzione delle scadenze e dei tempi previsti. (Italian) / rank
-
Normal rank
 
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: observation in simulated environment / rank
 +
Normal rank
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: structured portfolio / rank
 +
Normal rank
Property / scope note
 +
excludes the building, using and hanging of the suspension constructions. (English)
Property / scope note: excludes the building, using and hanging of the suspension constructions. (English) / rank
 +
Normal rank
Property / scope note
 +
limited to the physical placement of the temporary equipment. (English)
Property / scope note: limited to the physical placement of the temporary equipment. (English) / rank
 +
Normal rank
Property / scope note
 +
excludes the electrical connections (which are dealt with in the competence on mobile electricity) (English)
Property / scope note: excludes the electrical connections (which are dealt with in the competence on mobile electricity) (English) / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Safety awareness / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Awareness of other’s behavior / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Aware of movements around you / rank
 +
Normal rank
Property / training
 +
It is necessary that routines in different situations and environments are performed. (English)
Property / training: It is necessary that routines in different situations and environments are performed. (English) / rank
 +
Normal rank

Latest revision as of 10:19, 19 September 2024

Make sure to set up equipment according to deadlines and time schedules.
  • 00 00 00 04 30 TE
Language Label Description Also known as
English
Setup equipment in timely manner
Make sure to set up equipment according to deadlines and time schedules.
  • 00 00 00 04 30 TE

Statements

0 references
00 00 00 04 30
0 references
0 references
Transport, place, move, stack and transport technical performance equipment and materials according to the needs during the fit up. (English)
0 references
Inspect the technical performance equipment visually for damage, wear and tear. (English)
0 references
Mount and rig technical performance equipment according to instructions and/or plans. (English)
0 references
Take safety precautions when working at or below heights. (English)
0 references
Check that technical performance equipment and objects can move freely during different operations when needed. (English)
0 references
Immobilize technical performance equipment once in place. (English)
0 references
Secure technical performance equipment and accessories. (English)
0 references
Check that all technical performance equipment is secured according to safety procedures. (English)
0 references
Take action if something goes wrong or is unsafe. (English)
0 references
Report if something is not performed according to the agreed procedures. (English)
0 references
Principles of mechanics. (English)
0 references
Identifying and checking technical performance equipment. (English)
0 references
Suspension systems. (English)
0 references
I don't know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I am uncertain how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
I am more than able to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... doesn't know how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... is uncertain how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... knows how to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
... is more than able to make sure to set up equipment according to deadlines and time schedules. (English)
0 references
ETTE - European Theatre Technicians Education; Fit up and rig performance equipment, Chapter 10-1
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 1.2g) Select and use work equipment, especially ladders, scaffolding and tools – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF)
0 references
Germany Fachkraft für Veranstaltungstechnik – Event Technology Specialist - Learning Area A Skills, Knowledge and Competences – (Item 3) Setting up, bringing into service, connecting, and operating equipment – BiBB Bundesinstitut für Berufsbildung, AUSBILDUNG GESTALTEN - Fachkraft für Veranstaltungstechnik, Bonn 2017, ISBN 978-3-7639-5873-3 (Print), ISBN 978-3-96208-021-1 (PDF
0 references
Netherlands Qualification File Stage and Event Technology, crebonumber 79040, learning area B1-K1-W3 Plaatst en hangt licht, geluids-, beeldapparatuur en (overige) materialen in. SBB, Sectorchambre ICT and Creative Industry, version 2022 (to be released August 2022), Zoetermeer 2021.
0 references
0 references
TE
0 references
excludes the building, using and hanging of the suspension constructions. (English)
0 references
limited to the physical placement of the temporary equipment. (English)
0 references
excludes the electrical connections (which are dealt with in the competence on mobile electricity) (English)
0 references
It is necessary that routines in different situations and environments are performed. (English)
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata