Difference between revisions of "Manage sign-off of an installed system (Q397)"

From CompetenceBase

Make sure an installed technical system is adequately transferred and signed off for.

(‎Created claim: skill (EN) (P27): ensure the quality of the work done, #quickstatements; #temporary_batch_1712060673057)
(‎Created claim: skill (EN) (P27): adequately transfer the system (safety, functioning, attention points...), #quickstatements; #temporary_batch_1712060673057)
Property / skill (EN)
 +
adequately transfer the system (safety, functioning, attention points...) (English)
Property / skill (EN): adequately transfer the system (safety, functioning, attention points...) (English) / rank
 +
Normal rank

Revision as of 12:25, 2 April 2024

Make sure an installed technical system is adequately transferred and signed off for.
Language Label Description Also known as
English
Manage sign-off of an installed system
Make sure an installed technical system is adequately transferred and signed off for.

    Statements

    0 references
    70 61 00 04 10
    0 references
    Manage sign-off of an installed system (English)
    0 references
    ein installiertes System abmelden (German)
    0 references
    tekenen voor een geïnstalleerd systeem (Dutch)
    0 references
    gestire l’approvazione di un sistema installato (Italian)
    0 references
    0 references
    Make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    Sicherstellen, dass ein installiertes technisches System angemessen übertragen und abgemeldet wird. (German)
    0 references
    Ervoor zorgen dat een geïnstalleerd technisch systeem naar behoren wordt overgedragen en afgetekend. (Dutch)
    0 references
    Assicurarsi che un sistema tecnico installato sia trasferito e autorizzato in modo adeguato. (Italian)
    0 references
    1.08
    0 references
    0 references
    0 references
    0 references
    I don't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    I am uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    I know how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    I am more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    ... doesn't know how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    ... is uncertain how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    ... knows how to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    ... is more than able to make sure an installed technical system is adequately transferred and signed off for. (English)
    0 references
    check if the system functions (English)
    0 references
    check the safety requirements of the system used (English)
    0 references
    ensure the quality of the work done (English)
    0 references
    adequately transfer the system (safety, functioning, attention points...) (English)
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata