Difference between revisions of "technically design monitoring system (Q741)"
From CompetenceBase
(Changed [en] label: technically design monitoring system) | (Removed claim: import id (P39): 9, #quickstatements; #temporary_batch_1724141793623) | ||||||
(5 intermediate revisions by 3 users not shown) | |||||||
label / de | label / de | ||||||
- | + | Bühnenmonitoring-System planen | |||||
label / nl | label / nl | ||||||
- | + | technisch ontwerp monitor systeem | |||||
description / en | description / en | ||||||
- | + | Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. | |||||
Property / import id | |||||||
- | 9
| ||||||
Property / import id: 9 / rank | |||||||
- | |||||||
Property / ESCO Skill/Competence | |||||||
+ | |||||||
Property / ESCO Skill/Competence: Technically design a sound system / rank | |||||||
+ | Normal rank | ||||||
Property / ESCO Skill/Competence: Technically design a sound system / qualifier | |||||||
+ | note: broader concept |
Latest revision as of 08:17, 20 August 2024
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
- 02 00 10 05 25 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | technically design monitoring system | Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. |
|
Statements
25
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25
0 references