Difference between revisions of "technically design monitoring system (Q741)"

From CompetenceBase

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.

(‎Changed [en] label: Technically design monitoring system (ESSENCE))
(‎Removed claim: import id (P39): 9, #quickstatements; #temporary_batch_1724141793623)
 
(13 intermediate revisions by 3 users not shown)
label / enlabel / en
-
Technically design monitoring system (ESSENCE)
+
technically design monitoring system
label / delabel / de
 +
Bühnenmonitoring-System planen
label / nllabel / nl
 +
technisch ontwerp monitor systeem
description / dedescription / de
 +
Entsprechend der Wünsche der Künstler und der Produktionsanforderungen ein Bühnenmonitoring-System planen, dabei die Akteure hinsichtlich der idealen Lösung (Bodenmonitore, side fills, In-Ear-Systeme) beraten und geeignetes Material aussuchen.
description / nldescription / nl
 +
Een monitoringsysteem plannen op basis van de eisen van de artiesten en de productie. Adviseer waar nodig artiesten en sprekers over de beste aanpak (wedge, side-fill, in-ear) voor de taak. De apparatuur kiezen die het meest geschikt is voor de taak.
Property / import id
-

9

Amount9
Unit1
 
Property / import id: 9 / rank
-
Normal rank
 
Property / knowledge detail (EN)
-
construction ­and working principles, advantages and disadvantages of closed loudspeakers (“direct radiators”) (English)
 
Property / knowledge detail (EN): construction ­and working principles, advantages and disadvantages of closed loudspeakers (“direct radiators”) (English) / rank
-
Normal rank
 
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Technically design a sound system / rank
 +
Normal rank
Property / ESCO Skill/Competence: Technically design a sound system / qualifier
 +
note: broader concept

Latest revision as of 08:17, 20 August 2024

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES
Language Label Description Also known as
English
technically design monitoring system
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES

Statements

0 references
0 references
0 references
0 references
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata