Difference between revisions of "technically design signal distribution system (Q738)"

From CompetenceBase

Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)

(‎Changed [en] description: Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE))
(‎Removed claim: import id (P39): 6, #quickstatements; #temporary_batch_1724141793623)
 
(5 intermediate revisions by 3 users not shown)
label / enlabel / en
-
technically design signal distribution system (ESSENCE)
+
technically design signal distribution system
label / delabel / de
-
ein Signalverteilungssystem planen (ESSENCE)
+
Signalverteilungssystem planen
label / nllabel / nl
-
signaaldistributiesysteem technisch ontwerpen (ESSENCE)
+
signaaldistributiesysteem technisch ontwerpen
Property / import id
-

6

Amount6
Unit1
 
Property / import id: 6 / rank
-
Normal rank
 
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Technically design a sound system / rank
 +
Normal rank
Property / ESCO Skill/Competence: Technically design a sound system / qualifier
 +
note: broader concept

Latest revision as of 08:17, 20 August 2024

Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)
  • 02 00 10 05 22 ES
Language Label Description Also known as
English
technically design signal distribution system
Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)
  • 02 00 10 05 22 ES

Statements

0 references
0 references
Plan a signal distribution system based on the requirements of the production, the layout of the venue, and any existing media infrastructure. Such a system include digital point-to-point links or complex data networks, signal routing hardware, digital clocking, as well as analog lines and multicore systems. Create comprehensive documentation and distribute to all stakeholders. (English)
0 references
0 references
0 references
0 references
identify required input/output stations and their locations (English)
0 references
evaluate number of inputs and outputs per station (English)
0 references
define signal cabling on stage (English)
0 references
evaluate signal routing requirements (English)
0 references
evaluate and consider using existing infrastructure of the venue (English)
0 references
evaluate reliability requirements (English)
0 references
evaluate clocking requirements (English)
0 references
define cable runs, avoiding induction and interference (English)
0 references
define signal distribution and routing (English)
0 references
define clocking infrastructure (English)
0 references
define and write up network requirements (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 22
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata