Difference between revisions of "technically design signal distribution system (Q738)"

From CompetenceBase

Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)

(‎Created claim: skill (EN) (P27): evaluate number of inputs and outputs per station, #quickstatements; #temporary_batch_1720597940948)
(‎Removed claim: import id (P39): 6, #quickstatements; #temporary_batch_1724141793623)
 
(52 intermediate revisions by 3 users not shown)
label / enlabel / en
-
Technically design signal distribution system
+
technically design signal distribution system
label / delabel / de
 +
Signalverteilungssystem planen
label / nllabel / nl
 +
signaaldistributiesysteem technisch ontwerpen
aliases / en / 0aliases / en / 0
 +
02 00 10 05 22 ES
description / endescription / en
 +
Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)
description / dedescription / de
 +
Die von der Produktion benötigte Signalverteilungs-Infrastruktur planen und Bedarfe, Logistik, Aufbau und Konfiguration so dokumentieren und kommunizieren, dass die Inbetriebnahme auf der Produktion gelingt.
description / nldescription / nl
 +
Ontwerp de infrastructuur voor signaaldistributie op basis van de behoeften van de productie. Documenteer en communiceer vereisten, logistiek, set-up en configuratiedetails om een succesvolle implementatie ter plaatse te garanderen.
Property / import id
-

6

Amount6
Unit1
 
Property / import id: 6 / rank
-
Normal rank
 
Property / skill (EN)
 +
define signal cabling on stage (English)
Property / skill (EN): define signal cabling on stage (English) / rank
 +
Normal rank
Property / skill (EN)
 +
evaluate signal routing requirements (English)
Property / skill (EN): evaluate signal routing requirements (English) / rank
 +
Normal rank
Property / skill (EN)
 +
evaluate and consider using existing infrastructure of the venue (English)
Property / skill (EN): evaluate and consider using existing infrastructure of the venue (English) / rank
 +
Normal rank
Property / skill (EN)
 +
evaluate reliability requirements (English)
Property / skill (EN): evaluate reliability requirements (English) / rank
 +
Normal rank
Property / skill (EN)
 +
evaluate clocking requirements (English)
Property / skill (EN): evaluate clocking requirements (English) / rank
 +
Normal rank
Property / skill (EN)
 +
define cable runs, avoiding induction and interference (English)
Property / skill (EN): define cable runs, avoiding induction and interference (English) / rank
 +
Normal rank
Property / skill (EN)
 +
define signal distribution and routing (English)
Property / skill (EN): define signal distribution and routing (English) / rank
 +
Normal rank
Property / skill (EN)
 +
define clocking infrastructure (English)
Property / skill (EN): define clocking infrastructure (English) / rank
 +
Normal rank
Property / skill (EN)
 +
define and write up network requirements (English)
Property / skill (EN): define and write up network requirements (English) / rank
 +
Normal rank
Property / skill (EN)
 +
write up technical documentation (English)
Property / skill (EN): write up technical documentation (English) / rank
 +
Normal rank
Property / skill (EN)
 +
write up equipment list (English)
Property / skill (EN): write up equipment list (English) / rank
 +
Normal rank
Property / skill (EN)
 +
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
Property / skill (EN): write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English) / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Accuracy / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Able to follow instructions and procedures / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Able to solve complex issues / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Creative Thinking / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Assertiveness / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Flexibility / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Sense of methodology / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Able to cooperate / rank
 +
Normal rank
Property / autonomy / attitude
 +
Property / autonomy / attitude: Able to act on own initiative / rank
 +
Normal rank
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: structured portfolio / rank
 +
Normal rank
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: post Box Exercise / rank
 +
Normal rank
Property / unique identifier
 +
02 00 10 05 22
Property / unique identifier: 02 00 10 05 22 / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Signal lines/Analog / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Signal lines/Digital / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: General/Ethernet / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: General/IP (Internet protocol) / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Sound/Applications / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Mixing console/Signal flow / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Digital systems/Properties and parameters / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Digital systems/Clocking / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Digital systems/Latency / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Electroacoustics/Signals / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Production practice/Planning and implementation / rank
 +
Normal rank
Property / knowledge
 +
Property / knowledge: Documenting / rank
 +
Normal rank
Property / ESCO Skill/Competence
 +
Property / ESCO Skill/Competence: Technically design a sound system / rank
 +
Normal rank
Property / ESCO Skill/Competence: Technically design a sound system / qualifier
 +
note: broader concept

Latest revision as of 08:17, 20 August 2024

Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)
  • 02 00 10 05 22 ES
Language Label Description Also known as
English
technically design signal distribution system
Design a signal distribution infrastructure based on the needs of the production. Document and communicate requirements, logistics, set-up and configuration details to ensure successful implementation on-site. (ESSENCE)
  • 02 00 10 05 22 ES

Statements

0 references
0 references
Plan a signal distribution system based on the requirements of the production, the layout of the venue, and any existing media infrastructure. Such a system include digital point-to-point links or complex data networks, signal routing hardware, digital clocking, as well as analog lines and multicore systems. Create comprehensive documentation and distribute to all stakeholders. (English)
0 references
0 references
0 references
0 references
identify required input/output stations and their locations (English)
0 references
evaluate number of inputs and outputs per station (English)
0 references
define signal cabling on stage (English)
0 references
evaluate signal routing requirements (English)
0 references
evaluate and consider using existing infrastructure of the venue (English)
0 references
evaluate reliability requirements (English)
0 references
evaluate clocking requirements (English)
0 references
define cable runs, avoiding induction and interference (English)
0 references
define signal distribution and routing (English)
0 references
define clocking infrastructure (English)
0 references
define and write up network requirements (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 22
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata