Difference between revisions of "assess power needs (Q849)"

From CompetenceBase

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)

(‎Changed [en] label: assess power needs)
(‎Changed [de] label: den Elektrizitätsbedarf ermitteln)
label / delabel / de
-
den Elektrizitätsbedarf ermitteln (ESSENCE)
+
den Elektrizitätsbedarf ermitteln

Revision as of 10:02, 15 August 2024

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
  • 11 20 10 05 10 ES

Statements

0 references
0 references
37
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata