Difference between revisions of "assess power needs (Q849)"
From CompetenceBase
(Changed [en] description: Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)) | (Changed [en] label: assess power needs) | ||
label / en | label / en | ||
- | + | assess power needs |
Revision as of 10:40, 6 August 2024
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE)
- 11 20 10 05 10 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | assess power needs | Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available. (ESSENCE) |
|
Statements
37
0 references
10
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references