Difference between revisions of "assess power needs (ESSENCE) (Q849)"

From CompetenceBase

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.

(‎Changed [en] description: Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.)
(‎Added [de] description: Die benötigte elektrische Gesamtleistung einer Produktion oder Abteilung ermitteln und die Positionen und Dimensionierung elektrischer Anschlüsse festlegen.)
description / dedescription / de
 +
Die benötigte elektrische Gesamtleistung einer Produktion oder Abteilung ermitteln und die Positionen und Dimensionierung elektrischer Anschlüsse festlegen.

Revision as of 17:25, 21 July 2024

Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
assess power needs (ESSENCE)
Define the total electrical power required for a production or department, and the locations at which electricity outlets must be made available.
  • 11 20 10 05 10 ES

Statements

0 references
0 references
37
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata