Difference between revisions of "technically design monitoring system (ESSENCE) (Q741)"
From CompetenceBase
(Added [de] label: ein Bühnenmonitoring-System planen (ESSENCE)) | (Added [de] description: Entsprechend der Wünsche der Künstler und der Produktionsanforderungen ein Bühnenmonitoring-System planen, dabei die Akteure hinsichtlich der idealen Lösung (Bodenmonitore, side fills, In-Ear-Systeme) beraten und geeignetes Material aussuchen.) | ||
description / de | description / de | ||
+ | Entsprechend der Wünsche der Künstler und der Produktionsanforderungen ein Bühnenmonitoring-System planen, dabei die Akteure hinsichtlich der idealen Lösung (Bodenmonitore, side fills, In-Ear-Systeme) beraten und geeignetes Material aussuchen. |
Revision as of 17:12, 21 July 2024
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
- 02 00 10 05 25 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | technically design monitoring system (ESSENCE) | Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job. |
|
Statements
9
0 references
25
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25
0 references