Difference between revisions of "Assess power needs (ESSENCE) (Q849)"

From CompetenceBase

Prepare and manage the provision of electrical power for different areas.

(‎Created claim: knowledge (P29): 3-phase powersystems (Q1030), #quickstatements; #temporary_batch_1720770094487)
(‎Created claim: knowledge (P29): Voltage drop in conductors (Q1025), #quickstatements; #temporary_batch_1720770094487)
Property / knowledge
 +
Property / knowledge: Voltage drop in conductors / rank
 +
Normal rank

Revision as of 07:44, 12 July 2024

Prepare and manage the provision of electrical power for different areas.
  • 11 20 10 05 10 ES
Language Label Description Also known as
English
Assess power needs (ESSENCE)
Prepare and manage the provision of electrical power for different areas.
  • 11 20 10 05 10 ES

Statements

0 references
0 references
37
0 references
0 references
0 references
TeBeVat Competence: 11 20 10 04 10
0 references
0 references
Analyse the needs of the department (English)
0 references
Calculate the needed power (English)
0 references
Calculate cables (English)
0 references
List the required equipment (English)
0 references
Draw plans of power distribution (English)
0 references
11 20 10 05 10 ES
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata