Difference between revisions of "Technically design monitoring system (Q741)"

From CompetenceBase

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.

(‎Created claim: knowledge (P29): Acoustics/Sound and sound waves (Q887), #quickstatements; #temporary_batch_1720770094487)
(‎Created claim: knowledge (P29): Acoustics/Room acoustics (Q888), #quickstatements; #temporary_batch_1720770094487)
Property / knowledge
 +
Property / knowledge: Acoustics/Room acoustics / rank
 +
Normal rank

Revision as of 07:42, 12 July 2024

Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES
Language Label Description Also known as
English
Technically design monitoring system
Plan a monitoring system based on the requirements of the artists and the production. Where required, advise artists and speakers as to the best approach (wedge, side-fill, in-ear) for the task. Choose the equipment best suited to the job.
  • 02 00 10 05 25 ES

Statements

0 references
0 references
9
0 references
0 references
0 references
0 references
interpret technical riders (English)
0 references
consider artist requirements (English)
0 references
consider acoustic environment (English)
0 references
determine the amount and type of monitor feeds (English)
0 references
consider interaction with front-of-house mixer (splitting, gain sharing, phantom power) (English)
0 references
support the monitoring needs of artists (English)
0 references
recommend monitoring approaches to artists and develop practical system solutions (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 25 ES
0 references
construction ­and working principles, advantages and disadvantages of closed loudspeakers (“direct radiators”) (English)
0 references

ESCO description

Sectoral layer

Assessment

References

 

Wikidata