Difference between revisions of "Technically design signal distribution system (Q738)"
From CompetenceBase
(Created claim: unique identifier (P25): 02 00 10 05 22 ES, #quickstatements; #temporary_batch_1720599491678) | (Set [en] alias: 02 00 10 05 22 ES) | ||
aliases / en / 0 | aliases / en / 0 | ||
+ | 02 00 10 05 22 ES |
Revision as of 08:27, 10 July 2024
No description defined
- 02 00 10 05 22 ES
Language | Label | Description | Also known as |
---|---|---|---|
English | Technically design signal distribution system | No description defined |
|
Statements
6
0 references
Plan a signal distribution system based on the requirements of the production, the layout of the venue, and any existing media infrastructure. Such a system include digital point-to-point links or complex data networks, signal routing hardware, digital clocking, as well as analog lines and multicore systems. Create comprehensive documentation and distribute to all stakeholders. (English)
0 references
22
0 references
identify required input/output stations and their locations (English)
0 references
evaluate number of inputs and outputs per station (English)
0 references
define signal cabling on stage (English)
0 references
evaluate signal routing requirements (English)
0 references
evaluate and consider using existing infrastructure of the venue (English)
0 references
evaluate reliability requirements (English)
0 references
evaluate clocking requirements (English)
0 references
define cable runs, avoiding induction and interference (English)
0 references
define signal distribution and routing (English)
0 references
define clocking infrastructure (English)
0 references
define and write up network requirements (English)
0 references
write up technical documentation (English)
0 references
write up equipment list (English)
0 references
write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
0 references
02 00 10 05 22 ES
0 references