Difference between revisions of "Set up monitoring system (Q746)"

From CompetenceBase

Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artists/performers/speakers.

(‎Created claim: acceptable assessment methods (P31): observation in simulated environment (Q40), #quickstatements; #temporary_batch_1720599377059)
(‎Created claim: acceptable assessment methods (P31): observation on Site (Q38), #quickstatements; #temporary_batch_1720599377059)
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: observation on Site / rank
 +
Normal rank

Revision as of 08:16, 10 July 2024

Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artists/performers/speakers.
Language Label Description Also known as
English
Set up monitoring system
Install a stage monitoring system and adapt the plan to the local venue and the specific requirements of the artists/performers/speakers.

    Statements

    0 references
    0 references
    16
    0 references
    0 references
    0 references
    follow technical design (English)
    0 references
    follow stage plan (English)
    0 references
    adapt design to local conditions (English)
    0 references
    cater to the monitoring needs of artists (English)
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata