Difference between revisions of "Technically design signal distribution system (Q738)"

From CompetenceBase

No description defined

(‎Created claim: acceptable assessment methods (P31): structured portfolio (Q41), #quickstatements; #temporary_batch_1720599377059)
(‎Created claim: acceptable assessment methods (P31): post Box Exercise (Q29), #quickstatements; #temporary_batch_1720599377059)
Property / acceptable assessment methods
 +
Property / acceptable assessment methods: post Box Exercise / rank
 +
Normal rank

Revision as of 08:16, 10 July 2024

No description defined
Language Label Description Also known as
English
Technically design signal distribution system
No description defined

    Statements

    0 references
    0 references
    6
    0 references
    Plan a signal distribution system based on the requirements of the production, the layout of the venue, and any existing media infrastructure. Such a system include digital point-to-point links or complex data networks, signal routing hardware, digital clocking, as well as analog lines and multicore systems. Create comprehensive documentation and distribute to all stakeholders. (English)
    0 references
    0 references
    0 references
    0 references
    identify required input/output stations and their locations (English)
    0 references
    evaluate number of inputs and outputs per station (English)
    0 references
    define signal cabling on stage (English)
    0 references
    evaluate signal routing requirements (English)
    0 references
    evaluate and consider using existing infrastructure of the venue (English)
    0 references
    evaluate reliability requirements (English)
    0 references
    evaluate clocking requirements (English)
    0 references
    define cable runs, avoiding induction and interference (English)
    0 references
    define signal distribution and routing (English)
    0 references
    define clocking infrastructure (English)
    0 references
    define and write up network requirements (English)
    0 references
    write up technical documentation (English)
    0 references
    write up equipment list (English)
    0 references
    write up resource requirements: electricity, loads, crew, space, time, interaction and coordination with other departments, transport and handling, storage space (English)
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata