Difference between revisions of "Fit up and rig performance equipment (Q782)"

From CompetenceBase

Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.

(‎Created claim: place in process (P28): Independent (Q45), #quickstatements; #temporary_batch_1720596369061)
(‎Created claim: EQF level (P17): EQF 3 (Q422), #quickstatements; #temporary_batch_1720596475241)
Property / EQF level
 +
Property / EQF level: EQF 3 / rank
 +
Normal rank

Revision as of 07:28, 10 July 2024

Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.
Language Label Description Also known as
English
Fit up and rig performance equipment
Unload, hang, place and secure different types of temporary performance equipment on existing structures and on and around the stage floor.

    Statements

    0 references
    0 references
    61
    0 references
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata