Difference between revisions of "Manage sign-off of an installed system (ESCO) (Q625)"

From CompetenceBase

Make sure an installed technical system is adequately transferred and signed off for.

(‎Added [nl] description: Ervoor zorgen dat een geïnstalleerd technisch systeem naar behoren wordt overgedragen en afgetekend.)
(‎Added [de] description: Sicherstellen, dass ein installiertes technisches System angemessen übertragen und abgemeldet wird.)
description / dedescription / de
 +
Sicherstellen, dass ein installiertes technisches System angemessen übertragen und abgemeldet wird.

Revision as of 14:29, 3 July 2024

Make sure an installed technical system is adequately transferred and signed off for.
Language Label Description Also known as
English
Manage sign-off of an installed system (ESCO)
Make sure an installed technical system is adequately transferred and signed off for.

    Statements

    0 references
    0 references
    70 61 00 04 10
    0 references
    1.08
    0 references
    0 references

    ESCO description

    Sectoral layer

    Assessment

    References

     

    Wikidata